What Is This Spreadsheet For?
Use this spreadsheet to create or update work orders in TRACTIAN in bulk. A work order is a task assigned to a technician or team to carry out maintenance, inspection, or repair work. This spreadsheet lets you import many work orders at once, assign them to assets and people, and set schedules and priorities.
Can I Import, Export, or Both?
Import (upload data into TRACTIAN): Yes
Export (download data from TRACTIAN): Yes
Column Reference
# | Column Name | What to Fill In | Required? | Accepted Values | Used In |
1 | Number | The work order number | Export only | — | Export |
2 | Title | The title of the work order | Yes | Any text | Both |
3 | Description | A description of the work to be done | No | Any text | Both |
4 | Status | The current status | No | Open, In Progress, On Hold, Closed, Canceled | Both |
5 | Priority | The priority level | No | Priority names configured in your company | Both |
6 | Categories | The categories assigned | No | Category names configured in your company | Both |
7 | Asset Path/Location (Ex: Location // Asset Name) | The asset or location this work order is for | No | Asset path from TRACTIAN (use | Both |
8 | Assigned Emails | Email addresses of assigned users | No | One or more emails, separated by semicolons | Both |
9 | Assigned Teams | Names of assigned teams | No | One or more team names, separated by semicolons | Both |
10 | Tags | Tags to attach | No | One or more tags, separated by semicolons | Both |
11 | Start Date | The scheduled start date | No | Date in YYYY-MM-DD format | Both |
12 | End Date | The scheduled end (due) date | No | Date in YYYY-MM-DD format | Both |
13 | Planning Status | The planning stage of the work order | No | Unplanned, Planned, Scheduled, Without Planning, Awaiting Scheduling | Both |
14 | External ID | An identifier from an external system | No | Any text | Both |
15 | Operation Costs | Cost information for the operation | No | Any text | Both |
16 | Operation Name | The name of the operation step | No | Any text | Both |
17 | Activity Type | The type of maintenance activity | No | Activity type names configured in your company | Both |
18 | Number of Workers | How many workers are needed | No | A whole number | Both |
19 | Planned Working Time (2h 30m) | The estimated time needed | No | Duration in | Both |
20 | Operation Assigned Team | The team assigned to this operation | No | A team name from TRACTIAN | Both |
21 | Operation Assigned Emails | Emails of technicians for this operation | No | One or more emails, separated by semicolons | Both |
22 | Operation Asset Path | The asset for this specific operation | No | Asset path from TRACTIAN | Both |
23 | Created At | When the work order was created | Export only | — | Export |
24 | Updated At | When the work order was last updated | Export only | — | Export |
25 | Created By | Who created the work order | Export only | — | Export |
26 | Updated By | Who last updated the work order | Export only | — | Export |
Columns in Detail
Number
This column is filled automatically when you export — it shows the unique number assigned to each work order.
You do not need to fill this column when importing. If you include a number, the row will be rejected because this field is read-only. Use the External ID column if you need to store your own identifier.
Title
The name of the work order (for example, "Q3 Bearing Inspection" or "Pump Overhaul").
This column is required for every row.
Status
The current status of the work order. Accepted values:
Open — work has not started
In Progress — work is underway
On Hold — work is paused
Closed — work is complete
Canceled — work order was canceled
Priority
The priority level for this work order. Must match a priority name configured in your company. The options vary by company.
Categories
One or more categories for this work order. Separate multiple categories with a semicolon (e.g.
Electrical; Preventive). Must match category names configured in your company.
Asset Path/Location (Ex: Location // Asset Name)
The asset or location this work order is for.
Use
//to separate hierarchy levels (e.g.Plant A // Line 2 // Conveyor Belt).The system will look up the asset automatically using this path.
Assigned Emails
Email addresses of the users assigned to this work order. Separate multiple emails with a semicolon.
The system will match each email to an existing user account automatically.
Assigned Teams
Names of teams assigned to this work order. Separate multiple teams with a semicolon.
Start Date / End Date
Enter dates in YYYY-MM-DD format (e.g.
2025-08-15).
Planning Status
Indicates where the work order is in the planning process. Accepted values:
Unplanned — no plan has been made yet
Planned — a plan exists but is not yet scheduled
Scheduled — a specific time has been set
Without Planning — planning is not applicable
Awaiting Scheduling — ready to be scheduled but not yet assigned a time
External ID
An identifier you use in another system (such as an ERP or ticketing system). This lets you link TRACTIAN work orders to records in other tools.
Operation Name / Activity Type / Number of Workers / Planned Working Time
These columns describe a single operation step within the work order.
Activity Type must match an activity type name configured in your company.
Planned Working Time uses the format
Xh Ym(e.g.2h 30mfor two hours and thirty minutes).
Operation Assigned Team / Operation Assigned Emails / Operation Asset Path
These columns assign resources specifically to the operation step, as opposed to the work order as a whole.
Created At / Updated At / Created By / Updated By
These columns are filled automatically when you export. You do not need to fill them when importing.
Custom Fields
This spreadsheet can include extra columns based on the custom fields your company has configured. These appear to the right of the standard columns and may include: dropdown selections, numbers, text, currency amounts, boolean (yes/no) values, checklists, dates, user references, asset references, and durations.
Tips for a Successful Import
Make sure every row has a value in the Title column — rows with a blank title will be skipped.
Do not fill the Number column — it is read-only and will cause the row to be rejected if you include it.
Use the External ID column if you need to store your own reference number.
Dates must be in YYYY-MM-DD format (e.g.
2025-08-15).When entering planned working time, use the format
Xh Ym(e.g.1h 45m).Category, priority, and activity type names must match exactly what is configured in TRACTIAN.
To assign multiple categories, emails, or teams, separate each value with a semicolon (
;).
Example Rows
Number | Title | Description | Status | Priority | Categories | Asset Path/Location (Ex: Location // Asset Name) | Assigned Emails | Start Date | End Date | Planning Status | External ID | Operation Name | Activity Type | Number of Workers | Planned Working Time (2h 30m) | Created At |
Quarterly Belt Inspection | Check tension and condition of all drive belts | Open | High | Mechanical; Preventive | Plant A // Line 2 // Conveyor | 2025-09-01 | 2025-09-05 | Scheduled | Belt Inspection | Preventive | 2 | 1h 30m | ||||
Pump Seal Replacement | Replace worn seals on hydraulic pump | Open | Medium | Mechanical | Plant B // Pump Room // Pump 3 | 2025-09-10 | Planned | ERP-20251 | Seal Replacement | Corrective | 1 | 3h 0m | ||||
Fire Suppression System Test | Annual test per safety protocol | Open | Low | Safety | 2025-10-01 | 2025-10-01 | Scheduled |
Row 1 creates a work order with an assigned user and full operation details. Row 2 includes an external ID from another system. Row 3 is a minimal work order with only required fields.
Frequently Asked Questions
Can I update existing work orders using this spreadsheet? No. This spreadsheet creates new work orders. Updating existing work orders must be done directly in TRACTIAN.
What happens if I include a value in the Number column? The row will be rejected. The Number column is read-only and is assigned automatically by TRACTIAN. Use the External ID column if you need to store your own identifier.
Can I create a work order without assigning it to an asset? Yes. The asset path is optional — you can leave it blank if the work order is not tied to a specific asset.
What happens if I enter a priority or category that does not exist? The row may be created but the priority or category will not be set. Make sure the values match exactly what is configured in your company.
Can I assign multiple people or teams to a work order? Yes. Separate multiple email addresses or team names with a semicolon in the same cell.